In Episode 1 (2019), the principal states that the old toilet block is full of asbestos, which is why it remains unused; however, when it is demolished, it is done in the open with dozens of children looking on. Asbestos removal must be done under special covered spaces that do not allow the dust to get into the air as it is at its most dangerous when disturbed/removed.